dafa大发手机版_dafa手机版官网

欢迎您浏览济南dafa手机版官网,主营:济南腻子粉,济南石膏粉,济南抹面砂浆等建筑装饰材料,大量批发,欢迎咨询。

专注绿色建筑装饰材料

经营管理理念:让客户用的放心!

24小时服务热线:

13864111871

当前位置: 首页 - 新闻动态 > 公司新闻
公司新闻
联系我们

济南福华建材厂

联系人:吴老师 

电话:13864111871 

手机:13864111871
          0531-81901300
地址:山东省济南市高新开发区巨野河办事处山圈村西


抹面砂浆施工期间会用到怎样的技术

来源: 日期:2023-05-25 发布人:

现在建筑中使用的绿色建材越来越多,抹面砂浆的应用也在不断发展,施工技术也在不断更新。那么抹面砂浆的具体施工工艺有哪些呢?下面和大家说说济南抹面砂浆施工技术。
Nowadays, there are more and more green building materials used in buildings, and the application of plastering mortar is also constantly developing, and construction technology is also constantly updating. So what are the specific construction techniques for plastering mortar? Next, let's talk about the construction technology of Jinan plastering mortar.
一、基层处理
1、 Grassroots treatment
基层施工前,需要将基层表面清理干净,保持干净整洁,无污渍。
Before the construction of the base layer, it is necessary to clean the surface of the base layer, keep it clean, tidy, and free from stains.
1.基面上有凹凸区域、裂纹或孔洞等,应该先修平整。
1. If there are concave and convex areas, cracks or holes on the base surface, they should be leveled first.
2.门窗框和墙之间的缝隙需要用填缝材料填实。
2. The gap between the door and window frames and the wall needs to be filled with caulking material.
3.提前24小时湿润基面,石膏抹灰施工前不能有明水。
3. Wet the base surface 24 hours in advance, and there should be no open water before the gypsum plastering construction.
4.需要做墙面、门窗、墙角等部位的抹灰护角。
4. It is necessary to plaster and protect the corners of walls, doors and windows, and walls.
二、抹面砂浆的工艺
2、 The process of plastering mortar
1.天花板。弹线、抹灰饼、标出水平线、抹平窗框缝隙、墙面冲筋、抹底层砂浆、抹面砂浆。
1. Ceiling. Snapping lines, plastering cakes, marking horizontal lines, smoothing window frame gaps, wall reinforcement, plastering bottom mortar, and plastering surface mortar.
2.墙壁。找标记线贴灰饼,抹踢脚线,保护门窗角,抹门窗框缝隙,墙面冲筋,抹底灰,抹面层灰。
2. Walls. Find the marking line, paste the mortar cake, plaster the baseboard, protect the door and window corners, plaster the door and window frame gaps, flush the wall, plaster the bottom mortar, and plaster the surface layer.
济南抹面砂浆
3.石膏抹面砂浆操作流程
3. Gypsum plastering mortar operation process
4.确定抹灰施工顺序,自上而下,从门的一侧开始,整面墙连续施工。
4. Determine the plastering construction sequence from top to bottom, starting from one side of the door, and continuously construct the entire wall.
5.普通混凝土天花板需要用抹灰膏抹一次。
5. Ordinary concrete ceilings need to be plastered once with plaster.
三、墙基要保持平整。
3、 The wall base should be kept flat.
设置标记和加固。立杆的间距应为1.2-1.5米,横杆的宽度应为0.03-0.05米
Set up markings and reinforcement. The spacing between upright poles should be 1.2-1.5 meters, and the width of horizontal poles should be 0.03-0.05 meters
1.抹灰施工厚度小于5厘米可采用抹灰抹灰施工,可在底层打底后,再做面层抹灰施工。
1. If the thickness of the plastering construction is less than 5 centimeters, the plastering construction can be used. The surface layer can be plastered after the bottom layer is bottomed.
2.根据设计厚度,施工后进行基层抹灰,然后用H型尺和刮刀紧贴钢筋,不断刮平层灰。
2. According to the design thickness, the base layer should be plastered after construction, and then an H-shaped ruler and scraper should be used to tightly adhere to the steel bars, continuously scraping the layer of mortar.
3.用抹子压光,然后用直尺检查墙面的平整度。
3. Use a trowel to polish and then use a ruler to check the flatness of the wall.
4.抹灰需要注意细节和清理相关区域。
4. Plastering requires attention to details and cleaning of relevant areas.
5.抹灰要清理地板灰,压光后需要注意保持通风,用水冲洗完。抹面砂浆施工结束后,抹灰工具需要清理干净。
5. When plastering, the floor plaster should be cleaned, and after polishing, attention should be paid to maintaining ventilation and rinsing with water. After the completion of plastering mortar construction, the plastering tools need to be cleaned.
抹面砂浆施工期间会用到的技术内容就讲解到这里了,希望能够给您好的帮助,更多事项就来我们网站进行咨询了解!
That's all for the technical content that will be used during the plastering mortar construction period. We hope it can be helpful to you. For more information, please come to our website Conduct consultation to understand!